You don't have javascript enabled. Good luck with that.
Pencarian
Warga Ingin Turap Kali Pesanggrahan Dibangun
.
photo Izzudin - Beritajakarta.id

Residents Hoped Sheet Pile in Pesanggrahan River

Citizens living in RT 08 and 10, RW 05 Perdatam Housing Complex, Ulujami, Pesanggrahan, South Jakarta hoped the government to immediately build a 900-meter sheet pile on Pesanggarahan River. All this time, citizen residential often flooded due to overflowing waters from the river.

Our citizen hoped the sheet pile could be built here

Chairman of RT 10/05, Ulujami Urban Village, Hadi Kresno said due to unavailable sheet pile, flood often hits his residential due to overflowing waters of Pesanggrahan River. Even, water level had touched two meters.

"Our citizen hoped the sheet pile could be built here," he expressed, Sunday (12/13).

Grogol River's Sheet Pile Damage

He disclosed, two years ago, locals had sent a proposal to Mayor of South Jakarta regarding sheet pile installation, but until now it has not been realized.

Meanwhile, Didin (50), a citizen of RT 10/05 who serves as a volunteer at the pump house near Perdatam Complex, expressed the floods as high as one meter that hit RW 05 area in Ulujami Urban Village, Saturday (12/12), has receded.

He disclosed, pump in Perdatam is owned by Ciliwung-Cisadane Flood Control Office (BBWSCC), which is built since 2003. In 2009, it was malfunctioned due to community self-sufficiency stopped. In three months ago, he continued, it was been replaced by BBWSCC with second machine.

"But I can't operate the machine because we have no solar," he exclaimed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye415 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye398 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye355 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik