You don't have javascript enabled. Good luck with that.
Pencarian
Pengukuran RDTR Desain Kalijodo Selesai Dirampungkan

Measurement for RDTR-PZ in Kalijodo Is Completed

Jakarta Spatial Planning Dept has completed the measurement process of Detail Spatial Plan and Zoning Regulations (RDTR-PZ) in Kalijodo. The measurement results will be used as a reference for park construction and its facilities.

The map is already done. Before park construction, we have to do measurement first. Thus its concept can be known, such as design and its construction cost

Gentur Wisnubaroto, Section Head of Planning and Spatial Pattern Evaluation for Jakarta Spatial Planning Dept said the measurement and mapping is done to know the construction concept.

"The map is already done. Before park construction, we have to do measurement first. Thus its concept can be known, such as design and its construction cost," he expressed, Wednesday (3/16).

Road Access in Kalijodo Elevated

Later on, Kalijodo on the edge of Jalan Bidara Raya, its river will be widened to 18 meters. Likewise with the channels of Krendang River toward the West Flood Canal (KBB) will be widened to 20 meters.

"Next, the construction will involve related unit," he finished.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye914 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye875 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye738 personAldi Geri Lumban Tobing
  4. 190 Satpol PP Personnel Deployed to Secure Jakarta Anniversary Celebration

    access_time26-06-2026 remove_red_eye704 personFolmer
  5. Night at The Library Marks Jakarta's 499th Anniversary with Five-Century Message

    access_time27-06-2026 remove_red_eye680 personAnita Karyati