You don't have javascript enabled. Good luck with that.
Pencarian
Lampu Sorot Dipasang di Lokasi Proyek Sudin Tata Air
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Spotlight Installed at Project Location of Water Management Sub-dept

South Jakarta Industry and Energy Sub-dept has installed three spotlights powered 1,000 watts in two different locations, South Jakarta.

Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night

One spotlight was installed on the right side of Ciliwung River, Jalan Abdullah Syafei, Kebon Baru Urban Village, Tebet in which still being conducted a sheet pile installation. 

"Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night," expressed Ihsan, Head of Supervision and Control Section for South Jakarta Industry and Energy Sub-dept, Thursday (4/28).

Temporary Lightings Added for 14 City Forests

While for two other spotlights, were installed at decker reparation location, precisely on Jl Jagakarsa Raya, Jagakarsa Urban Village, due to collapse.

"We move the PLN cable, thus the sub-dept can easily install the spotlight. We support the lighting thus they can work from day until night," he finished.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye949 personTP Moan Simanjuntak
  2. Second Pilkada 2024 Debate Theme Set, Don't Miss It

    access_time26-10-2024 remove_red_eye775 personAldi Geri Lumban Tobing
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye452 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye389 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye368 personAldi Geri Lumban Tobing