You don't have javascript enabled. Good luck with that.
Pencarian
Lampu Sorot Dipasang di Lokasi Proyek Sudin Tata Air

Spotlight Installed at Project Location of Water Management Sub-dept

South Jakarta Industry and Energy Sub-dept has installed three spotlights powered 1,000 watts in two different locations, South Jakarta.

Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night

One spotlight was installed on the right side of Ciliwung River, Jalan Abdullah Syafei, Kebon Baru Urban Village, Tebet in which still being conducted a sheet pile installation. 

"Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night," expressed Ihsan, Head of Supervision and Control Section for South Jakarta Industry and Energy Sub-dept, Thursday (4/28).

Temporary Lightings Added for 14 City Forests

While for two other spotlights, were installed at decker reparation location, precisely on Jl Jagakarsa Raya, Jagakarsa Urban Village, due to collapse.

"We move the PLN cable, thus the sub-dept can easily install the spotlight. We support the lighting thus they can work from day until night," he finished.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye986 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye644 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye617 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye604 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye574 personTiyo Surya Sakti