You don't have javascript enabled. Good luck with that.
Pencarian
Lampu Sorot Dipasang di Lokasi Proyek Sudin Tata Air

Spotlight Installed at Project Location of Water Management Sub-dept

South Jakarta Industry and Energy Sub-dept has installed three spotlights powered 1,000 watts in two different locations, South Jakarta.

Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night

One spotlight was installed on the right side of Ciliwung River, Jalan Abdullah Syafei, Kebon Baru Urban Village, Tebet in which still being conducted a sheet pile installation. 

"Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night," expressed Ihsan, Head of Supervision and Control Section for South Jakarta Industry and Energy Sub-dept, Thursday (4/28).

Temporary Lightings Added for 14 City Forests

While for two other spotlights, were installed at decker reparation location, precisely on Jl Jagakarsa Raya, Jagakarsa Urban Village, due to collapse.

"We move the PLN cable, thus the sub-dept can easily install the spotlight. We support the lighting thus they can work from day until night," he finished.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye971 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye931 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye820 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye709 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye606 personAnita Karyati