You don't have javascript enabled. Good luck with that.
Pencarian
Lampu Sorot Dipasang di Lokasi Proyek Sudin Tata Air

Spotlight Installed at Project Location of Water Management Sub-dept

South Jakarta Industry and Energy Sub-dept has installed three spotlights powered 1,000 watts in two different locations, South Jakarta.

Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night

One spotlight was installed on the right side of Ciliwung River, Jalan Abdullah Syafei, Kebon Baru Urban Village, Tebet in which still being conducted a sheet pile installation. 

"Proposal from Water Management Sub-dept to help for lighting, because the place is dark at night," expressed Ihsan, Head of Supervision and Control Section for South Jakarta Industry and Energy Sub-dept, Thursday (4/28).

Temporary Lightings Added for 14 City Forests

While for two other spotlights, were installed at decker reparation location, precisely on Jl Jagakarsa Raya, Jagakarsa Urban Village, due to collapse.

"We move the PLN cable, thus the sub-dept can easily install the spotlight. We support the lighting thus they can work from day until night," he finished.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye711 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye527 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye525 personAldi Geri Lumban Tobing
  4. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye512 personAnita Karyati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye502 personFakhrizal Fakhri