Marunda Dam Project Hampered by Land Acquisition Matters
access_time September 24 2016 04:44 PM remove_red_eye 1289
Reported by Aldi Geri Lumban Tobing | Translated by Nugroho Adibrata
Reported by Aldi Geri Lumban Tobing | Translated by Nugroho Adibrata
there are still 20 plots not been acquired, and I don't know who is the owner
Marunda Urban Village Head, Hilda Damayanti disclosed the landowner is difficult to be met. He assessed, there are three buildings that should be controlled thus she cannot do anything. Marunda Dam Construction Stagnated
"As I know, there are still 20 plots not been acquired, and I don't know who is the owner. I see three buildings must be controlled but we can't come and control but we have to check it out first," she told, Saturday (9/24).
Along with BPN, she assessed, the North Jakarta Administration is still looking for the landowner.
"Nevertheless, the problem like this must be solved this year," she stressed.
Linked News
-
Water Dept's Budget Added Up to Rp 150 B
access_timeKamis, 08 September 2016 11:30 WIB
remove_red_eye1247 personFolmer
Popular News
indeks