You don't have javascript enabled. Good luck with that.
Pencarian
Bangunan MRT Tahan Gempa Hingga 8,7 SR

Earthquake Resistance of MRT Building Is Up to 8.7 SR

The earthquake resistance of the Mass Rapid Transit (MRT) building is improved from 7 becomes 8.5-8.7 Richter Scale (SR). It is in accordance with SNI No. 1726/2012 on Earthquake Resilience Planning Procedures.

MRT earthquake resistance has been improved. It is based on SNI/2002 with consideration of earthquake every 500 years and the magnitude of the earthquake is 7 SR

PT MRT Jakarta Construction Director, Silvi Halim disclosed, based on SNI 2002, the earthquake resistance is only set up to 7 SR. But, with the new rule in 2012, it is improved up to 8.5-8.7 SR.

"MRT earthquake resistance has been improved. It is based on SNI/2002 with consideration of earthquake every 500 years and the magnitude of the earthquake is 7 SR," she stated, Thursday (12/15).

International Standard Applied for MRT Operational

She added, with the new rule, the earthquake consideration happened every 100 years and 1,000 years. Thus its resistance is also increased.

"Why it is changed, because it is seen earthquake that happened thus the design must by strengthened," he finished.

By so, it will influence on budgeting that issued. His side also requested for additional fund as much as Rp 2.566 trillion. 

It is proposed to Japan International Corporation (JICA) as the lender. PT MRT Jakarta has submitted it to the National Development Planning Agency (Bappenas).

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2634 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2356 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye977 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye839 personFakhrizal Fakhri
  5. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye747 personAldi Geri Lumban Tobing