You don't have javascript enabled. Good luck with that.
Pencarian
Picu Genangan, Tanggul di Kali Grogol Dibongkar
.
photo Nurito - Beritajakarta.id

Inhibiting Water Flow, Embankment at Grogol River Demolished

The embankment is made of concrete as long as eight meters, and only leaving only two meters for water flow

To minimize inundation in the upstream, a two-meter high embankment that inhibits Grogol River in Bukit Golf Pondok Indah Residence, Pondok Pinang, Kebayoran Lama, South Jakarta was demolished. 

Until mid-February 2017, other two embankments in the middle of the water flow will also be demolished gradually.

Anticipating Flood, East and West Flows Need Dam

Kebayoran Lama Sub-district Head, Sayid Ali disclosed, after sending reprimand letter, the residence management was willing to demolish the embankment. After this, inundation is hoped could be minimized from Cilandak, Pondok Labu and Lebak Bulus areas.

"The embankment is made of concrete as long as eight meters, and only leaving only two meters for water flow," he expressed, Thursday (2/2).

He explained that, despite there is beautify reason for Bukit Golf Pondok Indah Residence, it is clearly breaking the rules.

"The sub-district had difficulties to find out the cause of inundation, because it is located in the residence area," he told.

Luckily, after getting assistance of Jakarta DPRD, the ranks of Kebayoran Lama and Cilandak sub-districts could find out the cause of the inundation.

Linked News
Popular News indeks
  1. Takjil Supervision in Central Jakarta Begins Second Week

    access_time02-03-2025 remove_red_eye436 personBudhi Firmansyah Surapati
  2. Government Declares Ramadhan Starts on March 1, 2025

    access_time28-02-2025 remove_red_eye413 personBudhi Firmansyah Surapati
  3. Dishub: Lay Bay Remains Optimal to Support Public Transportation User Comfort

    access_time02-03-2025 remove_red_eye380 personAldi Geri Lumban Tobing
  4. Orderly Sidewalk Operation Targets Many Streets in Jakarta

    access_time27-02-2025 remove_red_eye372 personAldi Geri Lumban Tobing
  5. Jakarta ASN Working Hours Adjusted During Ramadan 2025

    access_time28-02-2025 remove_red_eye320 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik