You don't have javascript enabled. Good luck with that.
Pencarian
161 Mesin TPE Segera Dioperasikan

161 TPE Machines will Operate Soon

Around 161 machines of Electronic Parking Terminal (TPE) will be operated soon in the capital. Currently, these machines have been installed in five cities.

TPE operational is just awaiting a launching in the near future

Jakarta Transportation Dept. Head, Andri Yansyah disclosed, installed TPE machine is this year's procurement. Until now, there have been 40 machines operated.

"TPE operational is just awaiting a launching in the near future," he disclosed, Monday (2/13). 

13 TPE Machines at Jl H Juanda Officially Operated

He added such installation must be in accordance with Gubernatorial Regulation No. 188/2016 on Public Parking managed by local government.

"There are 400 points of on-street parking. There are totally 201 machines installed," he stated.

As known, a number of locations that have TPE, as follow:

1. Central Jakarta 

- Jl. Agus Salim, Jl. Juanda Raya, Jl. Juanda III and Jl. Pecenongan

2. North Jakarta 

- Jl. Pluit Sakti, Jl. Sunter Paradise and Jl. Muara Karang Raya

3. West Jakarta 

- Jl. Pinangsia Raya, Jl. Pancoran (north side), Jl. Pintu Kecil, Jl. Gajah Mada and Jl. Hayam Wuruk

4. South Jakarta

- Jl. Raden Fatah Raya and Jl. Tebah Raya

5. East Jakarta 

- Jl. Pegambiran/Perserikatan, Jl. Balai Pustaka Raya, and Jl. Pramuka.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1697 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1117 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye808 personDessy Suciati