You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan RPTRA di Kepulauan Seribu di Mulai Minggu Ini

Five RPTRAs Construction in Seribu Islands Started

Seribu Islands Public Housing and Residential Sub-dept. is about to develop five RPTRAs this year. It is targeted to be completed by the end of this year.

In two days, it has been ongoing

"In two days, it has been ongoing," expressed Romel Pasaribu, Head of Seribu Islands Public Housing and Residential Sub-dept., Tuesday (8/8).

The five locations that will have RPTRA are Panggang Island, Kelapa Island, Tidung Island, Harapan Island and Lancang Island. 

RPTRA Function Must Be More Optimized

In details, from those islands, Panggang Island will have RPTRA at RT 07/03 with 2,000 square meters width, Kelapa Island will have RPTRA at RW 04 with 2,000 square meters width, Tidung Island will have RPTRA with 2,000 square meters width, Harapan Island will have RPTRA with 1,500 square meters width, and Lancang Island will have RPTRA with 1,500 square meters width.

"We'll also do supervision thus it can be finished in the upcoming October," he stated.

He added, it would use eco-friendly concept. Thus design made is no element of tree logging. "Each park will spend Rp 1.5 billion through APBD," he told.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5421 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4576 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1771 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye995 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye948 personAldi Geri Lumban Tobing