You don't have javascript enabled. Good luck with that.
Pencarian
Sudinhub Jakpus Pasang 25 MCB di Jl Pintu Air Raya
.
photo Wuri Setyaningsih - Beritajakarta.id

25 MCBs Being Installed on Jalan Pintu Air Raya

Tens of movable concrete barrier (MCB) is installed on Jalan Pintu Air Raya, Pasar Baru, Sawah Besar today.

It's a one-way lane and only for one car. If it is used as a parking area, car or motorcycle won't be able to pass

Central Jakarta Transportation Sub-dept. Head, Harlem Simanjuntak said 25 MCBs are still being installed on the roadside. "Each MCB has one meter long," he expressed, Friday (1/26).

To Avoid Fire, MCB Boxes Installed on Streetlight Poles

It is done to anticipate illegal parking, whereas there have been four legal parking areas in the field. 

"It's a one-way lane and only for one car. If it is used as a parking area, car or motorcycle won't be able to pass. That's why we will routinely do supervision in the future," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1039 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye904 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye547 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye381 personAldi Geri Lumban Tobing