Here is Traffic Engineering During LRT's Train Lifting Process
Reported by Budhi Firmansyah Surapati | Translated by Nugroho Adibrata
Jakarta Transportation Dept. is about to apply traffic engineering situationally during the LRT's train lifting process from Tanjung Priok Port towards Kelapa Gading. Therefore, traffic at Jalan Kelapa Gading Boulevard will be closed.
The train will be arrived at the location at around 11 PM. After that, there will be a setting for lifting the train
Andri Yansyah, Head of Jakarta Transportation Dept. said it will be done on Saturday (4/14) at 10 PM from Tanjung Priok Port to the train lifting location at Jalan Boulevard Raya Kelapa Gading (in opposite of Kelapa Gading Mall).
LRT Construction Has Reached 65.17 Percent"The train will be arrived at the location at around 12 AM. After that, there will be a setting for lifting the train," he stated, Friday (4/13).
According to him, the train lifting routes from the port are Tanjung Priok Port (Airin Gate) at Jalan Cilincing Raya - Jalan Cakung Cilincing - loopbacks of Justus - Tugu Raya - Simpang Lima - Jalan Pegangsaan Dua - Jalan Kelapa Hybrida - Jalan Boulevard Kelapa Gading - Simpang Kelapa Nias - train lifting location in opposite of Kelapa Gading Mall.
During the lifting process, there will be road closure on the west side of Jalan Boulevard Raya Kelapa Gading, starting from Kelapa Gading Roundabout up to Simpang Kelapa Nias. It will be applied at 10 PM-6 AM.
For those coming from west or south toward north of Jalan Boulevard Raya Kelapa Gading, will be rerouted to Jalan Boulevard Timur Kelapa Gading - Gading Indah Raya - Jalan Kelapa Nias -Simpang Kelapa Nias.
"We urge motorists to avoid the road segment and adjust the traffic engineering in the field, obey the traffic signs, officer's direction and put safety first," he uttered.