You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Jakarta Lakukan Uji Coba SAT dari Lebak Bulus Ke Cipete Raya

MRT Train with Route Lebak Bulus-Cipete Raya Trialled

PT Mass Rapid Transit (MRT) Jakarta today is conducting system acceptance test (SAT) or trial towards MRT Jakarta train with route Lebak Bulus-Cipete Raya.

Yesterday we did trial at Lebak Bulus Depot, and now its route is extended to Cipete Raya Station

PT MRT Jakarta President Director, William Sabandar stated this trial is a continuation of previous trials, Thursday (8/9). 

First MRT Jakarta Train Tested

"Yesterday we did trial at Lebak Bulus Depot, and now its route is extended to Cipete Raya Station," he expressed, Saturday (8/11).

It is done by running train on the up-track lane towards HI Roundabout Station and will move to the down-track lane from HI Roundabout Station to Lebak Bulus Station.

"We hope it can be done successfully like yesterday," he explained.

In its operation, the train uses the communication based train control (CBTC) signaling system that is controlled from the operation control center (OCC) room by Traffic Dispatcher.

"The strength of this signaling system allows setting the time span between counters on the main route," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1581 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1438 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1302 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1095 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye966 personDessy Suciati