You don't have javascript enabled. Good luck with that.
Pencarian
 PDAM Prov DKI Jakarta Pastika 51 Suplai Air di Venue Asian Games Aman
.
photo Wuri Setyaningsih - Beritajakarta.id

PDAM: Water Supply at 51 Asian Games Venues is Safe

Besides ensuring the supply, it is also done on the quantity, quality and continuity of the water,

City PDAM along with two partners namely Palyja and Aetra ensures that clean water supply at 51 points of venues is fulfilled.

Barce Simarmata, Director of City PDAM Technical disclosed that 16 out of 51 venues are PAM customers, 27 venues are indirect customers who are served through the master meter to area managers such as Ancol and BLU Setneg for Gelora Bung Karno (GBK) and PPK Kemayoran/Athletes' Homestead, and 8 venues are not PAM customers (groundwater users).

Clean Water Supply Team Formed to Smoothen Asian Games

"Besides ensuring the supply, it is also done on the quantity, quality and continuity of the water," he expressed, Tuesday (8/14).

He explained that this commitment is proven by the increase in services such as relocation and rehabilitation of master meters in the GBK area. It is to increase the water supply to the area from 10 liters/second to 50 liters/second. His side also increased the pressure from 0.3-0.7 atm.

His side also increased the utilization of raw water in the west flood canal (KBB) through the moving bed bioreactor (MBBR) technology that uses microbes to reduce ammonia contained in raw water to improve the quality for further processing.

"Water supply is optimized by setting the allocation and pressure of water from the Pejompongan 1 water treatment plant to Senayan area by paying attention to the surrounding areas thus the water needs are met," he explaine d.

The PDAM, Palyja and Aetra have also built a booster pump (press pump), and Sunter reservoir that is located in opposite of BMW Park, Jalan Sunter Permai Raya, North Jakarta that serves to increase the continuity of water supply and pressure for Kemayoran area, Ancol, Martadinata, Gunung Sahari, and Pademangan.

Booster Pump has pumping capacity of 800 liters/second and 2,500 cubic meters of reservoir capacity. He also accelerated the construction of control room facilities in the IPA Buaran AETRA.

"This control room serves as monitoring, analyzing and controlling the production process operations from raw water becomes clean water, as well as the distribution process to customers by online," he stated.

Linked News
Popular News indeks
  1. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye593 personFolmer
  2. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye585 personDessy Suciati
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye431 personAldi Geri Lumban Tobing
  4. Residents Hope Another Free Homecoming Program Held Next Year

    access_time27-03-2025 remove_red_eye316 personDessy Suciati
  5. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye288 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik