You don't have javascript enabled. Good luck with that.
Pencarian
 PDAM Prov DKI Jakarta Pastika 51 Suplai Air di Venue Asian Games Aman

PDAM: Water Supply at 51 Asian Games Venues is Safe

Besides ensuring the supply, it is also done on the quantity, quality and continuity of the water,

City PDAM along with two partners namely Palyja and Aetra ensures that clean water supply at 51 points of venues is fulfilled.

Barce Simarmata, Director of City PDAM Technical disclosed that 16 out of 51 venues are PAM customers, 27 venues are indirect customers who are served through the master meter to area managers such as Ancol and BLU Setneg for Gelora Bung Karno (GBK) and PPK Kemayoran/Athletes' Homestead, and 8 venues are not PAM customers (groundwater users).

Clean Water Supply Team Formed to Smoothen Asian Games

"Besides ensuring the supply, it is also done on the quantity, quality and continuity of the water," he expressed, Tuesday (8/14).

He explained that this commitment is proven by the increase in services such as relocation and rehabilitation of master meters in the GBK area. It is to increase the water supply to the area from 10 liters/second to 50 liters/second. His side also increased the pressure from 0.3-0.7 atm.

His side also increased the utilization of raw water in the west flood canal (KBB) through the moving bed bioreactor (MBBR) technology that uses microbes to reduce ammonia contained in raw water to improve the quality for further processing.

"Water supply is optimized by setting the allocation and pressure of water from the Pejompongan 1 water treatment plant to Senayan area by paying attention to the surrounding areas thus the water needs are met," he explaine d.

The PDAM, Palyja and Aetra have also built a booster pump (press pump), and Sunter reservoir that is located in opposite of BMW Park, Jalan Sunter Permai Raya, North Jakarta that serves to increase the continuity of water supply and pressure for Kemayoran area, Ancol, Martadinata, Gunung Sahari, and Pademangan.

Booster Pump has pumping capacity of 800 liters/second and 2,500 cubic meters of reservoir capacity. He also accelerated the construction of control room facilities in the IPA Buaran AETRA.

"This control room serves as monitoring, analyzing and controlling the production process operations from raw water becomes clean water, as well as the distribution process to customers by online," he stated.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1933 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye1025 personDessy Suciati
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye720 personBudhi Firmansyah Surapati
  4. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye640 personDessy Suciati
  5. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye500 personDessy Suciati