You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Trotoar Jalan Soemarno Pulogebang Rampung
....
photo Nurito - Beritajakarta.id

Sidewalk Arrangement at Jalan Soemarno Pulogebang Finished

The 2,483-meter width sidewalk arrangement on Jalan Soemarno, Pulogebang, Cakung, East Jakarta as long as 1.7 kilometers is finally completed by spending Rp 3.5 billion from APBD.

With this box ducting, the utility owner can no longer dig the ground on the sidewalk

East Jakarta Bina Marga Sub-dept.'s Utility Network and Sidewalk Section Head, Anto Marpaung stated that it has been carried out since July and now has been finished. Sidewalk itself is equipped by 25 units of box ducting for utility networks with a distance of about 25 meters per each.

Five Sidewalks in Sawah Besar Repaired

"With this box ducting, the utility owner can no longer dig the ground on the sidewalk," he stated, Wednesday (9/19).

According to him, the sidewalk that is in the access road to the East Jakarta mayor's office and the Pulogebang Terminal is also equipped by the park and is disability friendly.

Aside that, it is also completed by a safety iron thus carts or motorbikes are not easily crossed.

Linked News
Popular News indeks
  1. Five Transjabodetabek Routes will Be Added to Tackle Traffic Congestion

    access_time09-05-2025 remove_red_eye667 personDessy Suciati
  2. Tanah Abang SDA Taskforce Normalizes Channels in Two Locations

    access_time12-05-2025 remove_red_eye452 personFolmer
  3. Munjirin Optimizes Physical and Non-Physical Development in East Jakarta

    access_time08-05-2025 remove_red_eye377 personNurito
  4. Community Work Held to Clean Environment in Petamburan

    access_time11-05-2025 remove_red_eye353 personFolmer
  5. Baduy Tribe Meets Pramono-Rano, Leaves Message of Protecting Nature

    access_time09-05-2025 remove_red_eye293 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik