You don't have javascript enabled. Good luck with that.
Pencarian
Ini Rekayasa Lalin Saat Malam Pergantian Tahun

Here is Traffic Engineering Over New Year's Eve

As we know, the capital has prepared various events to welcome the New Year's Eve celebrations tonight. Surely, it would be crowded by people who want to celebrate.

It will be executed gradually by observing field conditions

Therefore, to hinder severe traffic jam, traffic engineering has been applied in a number of roads.

Various Event Ready to Welcome New Year's Eve in Jakarta

It will be applied at around 5 PM-1 AM, starting from Jalan Medan Merdeka Barat - Jalan MH Thamrin and parts of Jalan Jenderal Sudirman (until Dukuh Atas).

Jakarta Transportation Dept. Acting Head, Sigit Wijatmoko stated that the road condition must be sterile.

"It will be executed gradually by observing field conditions," he expressed, Sunday (12/30).

Here is traffic engineering that will be set during New Year's Eve, as follows;

1. Harmoni

- Vehicles heading South, will be rerouted to Jalan Juanda – Lapangan Banteng – Jalan Pejambon – Jalan Ridwan Rais, so forth

2. Semanggi 

- Vehicles heading North, will be rerouted to Jalan Margono Joyohadikusumo – Jalan KH Mas Mansyur or Jalan Galunggung, so forth

3. West - East or vice versa

- Vehicles will be directed to pass through Jalan Suryo Pranoto – Jalan Juanda – Jalan Pos – Jalan Gunung Sahari – etc, or Jalan Tambak – Jalan Sultan Agung – Jalan Galunggung so forth

To optimize it, around 478 officers will be on standby in the field.

"I hope every motorist can obey the traffic rules and the field officer's direction," he hoped.

Linked News
Popular News indeks
  1. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye995 personNurito
  2. Jakarta KPU Records More Than 8.2 Million Registered Voters

    access_time06-07-2026 remove_red_eye909 personFolmer
  3. Jakartans Can Now Access 3-Day Air Quality Forecasts

    access_time06-07-2026 remove_red_eye602 personAldi Geri Lumban Tobing
  4. Central Jakarta Continues Pursuing a Target of 50 Percent Waste Sorting

    access_time06-07-2026 remove_red_eye575 personFolmer
  5. Addressing Collapsed Road in Pulo Gadung is a Priority, Pramono Says

    access_time08-07-2026 remove_red_eye568 personDessy Suciati