You don't have javascript enabled. Good luck with that.
Pencarian
 Progres Normalisasi Saluran Jl Musik Raya Capai 45 Persen

Channel Normalization at Jalan Musik Raya Reaches 45 Percent

A water channel, which is still being normalized on Jalan Musik Raya, RW 07, Pegangsaan Dua Urban Village, Kelapa Gading, North Jakarta has reached 45 percent. It is targeted to be completed in three weeks ahead.

Prior to repair, it was full of mud and unoptimal. I saw its sheetpiles also broken

Normalization is conducted up to 158 meters length. It includes repairing and widening of channel from 60 centimeters into 1 meter. 

Normalization Conducted on Jalan Danau Buyan Kecil's Channel

"Prior to repair, it was full of mud and unoptimal. I saw its sheetpiles also broken," he expressed, Monday (2/18).

It is also downstream of the micro channel in the residential area, RW 05. As a result, because of unoptimal channel, it triggers a puddle.

Despite the work is unfinished, water from the channel can already flow smoothly towards the Accordion connecting channel.

"After this work, hopefully it can overcome puddle in RW 05, Pegangsaan Dua," he hoped.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye976 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye875 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye712 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati