You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Bangun Saluran di Petukangan Utara
.
photo Mustaqim Amna - Beritajakarta.id

Channel Development in Petukangan Utara Accelerated

South Jakarta Water Resources (SDA) Sub-agency is speeding up the water channel development as long as 50 meters on Jalan Palem VIII, Petukangan Utara, Pesanggrahan.

The channel to have 70 centimeters width with 2 meters height

Its development has been carried out since May 10 and is targeted to be complete in early July.

Maintenance Division Head Junjung said 12 personnel and 1 heavy equipment have been alerted to the location.

Absorption Wells Construction in Sawah Besar Accelerated

"The channel to have 70 centimeters width with 2 meters height. Right now we have entered 15 days," he expressed, Monday (5/25).

It is a proposed priority activity undertaken to deal with floods and inundation in the surrounding area.

"If it has been completed, the flow of water from residential areas can be smooth when the rainy season," he stated.

Linked News
Popular News indeks
  1. District Community Health Centers in East Jakarta Operate for 24 Hours

    access_time05-04-2025 remove_red_eye501 personNurito
  2. Backflow at Kampung Rambutan Terminal Increases as Mudik Return Flow Peaks

    access_time04-04-2025 remove_red_eye490 personNurito
  3. Kalideres Bus Terminal Adds 55 Night Transport Units

    access_time05-04-2025 remove_red_eye396 personTiyo Surya Sakti
  4. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye358 personTiyo Surya Sakti
  5. Ship Surveillance in Bokor Island Waters Intensified for Eid Holiday

    access_time03-04-2025 remove_red_eye313 personAnita Karyati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik