Channel Development in Petukangan Utara Accelerated
access_time May 25 2020 05:43 PM remove_red_eye 1109
Reported by Mustaqim Amna | Translated by Nugroho Adibrata
Reported by Mustaqim Amna | Translated by Nugroho Adibrata
South Jakarta Water Resources (SDA) Sub-agency is speeding up the water channel development as long as 50 meters on Jalan Palem VIII, Petukangan Utara, Pesanggrahan.
The channel to have 70 centimeters width with 2 meters height
Its development has been carried out since May 10 and is targeted to be complete in early July.
Maintenance Division Head Junjung said 12 personnel and 1 heavy equipment have been alerted to the location.
Absorption Wells Construction in Sawah Besar Accelerated"The channel to have 70 centimeters width with 2 meters height. Right now we have entered 15 days," he expressed, Monday (5/25).
It is a proposed priority activity undertaken to deal with floods and inundation in the surrounding area.
"If it has been completed, the flow of water from residential areas can be smooth when the rainy season," he stated.