You don't have javascript enabled. Good luck with that.
Pencarian
Mulai Layani Penumpang, Dishub Berlakukan Tiga Zona Ketat Pelabuhan Kaliadem

Dishub Divides Kaliadem Port's Checkpoint into Three Checking Zones

Jakarta Transportation Agency (Dishub) carries out strict monitoring in three zones of Kaliadem Port's checkpoint after public transports are allowed to operate since Monday (6/8).

Monitoring and checking are carried out by ports unit's integrated team and KSOP

Jakarta Dishub's Regional Port Operator Unit (UPPD) I Head, Maruli mentioned, in order to tightening access to Thousand Islands, his side divided 3 zones in the Kaliadem Port's checkpoint. Those are public zone, limited zone, and sterile zone.

In public zone, passengers will be ensured to wear mask. Furthermore, passengers from outside of Jabodetabek area will be checked whether they bring SIKM documents or not.

Anies Ensures All Health Protocols in Jakarta Run Well

Limited zone is located in port's entrance where officers will check passengers' body temperature and health certificate. While sterile zone is an area where officers inspect the vessel safety equipment and ensure the passengers don't exceed 50 percent of the total capacity.

"Monitoring and checking are carried out by ports unit's integrated team and KSOP," he added, Tuesday (6/9).

Jakarta Dishub's Marine and Port Transportation Management Unit Head, Dedy Dwi Widodo conveyed, his side has operated all vessels to serve passengers for Kaliadem-Thousand Islands route.

"Yesterday, we transported 43 passengers to Thousand Islands. It was less than 50 percent of vessel's capacity. I think it needs to be socialized widely, because we just reopen this service after being closed for a long time," he stated.

His side also instructed personnel to spray ships with disinfectant before and after transporting passengers.

"Before boarding, passengers should wash their hands or use hand sanitizer," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1683 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1470 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1332 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1111 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye800 personDessy Suciati