You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan Komunal Dibangun di RW 08 Kecamatan Matraman

Two Communal Infiltration Wells Built in Matraman

This is the initial stage and we target to build 100 wells this year

Two communal infiltration wells have been built on the yard of the Al-Hidayah Musala, Jalan Pengayoman, RT 08/08, Utan Kayu Utara, Matraman. It is done to accommodate water in large quantities that can be utilized by locals.

Matraman Sub-district Head Andriansyah explained it was the result of collaboration with one of the banks through the Corporate Social Responsibility (CSR) program.

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"This is the initial stage and we target to build 100 wells this year," he expressed, Tuesday (11/17).

He explained, those wells were made in a diameter of 1.2 meters and 2 meters depth. In the middle of them, there was a pipe measuring 4 inches with 20 meters depth.

"Thus far every well can be completed in two to three days," he said.

He exclaimed the land used to build the well itself was in an existing infiltration well, but had been deepened.

"One well can accommodate rainwater from 10 residents' houses," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5480 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4617 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1824 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1022 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1018 personFakhrizal Fakhri