You don't have javascript enabled. Good luck with that.
Pencarian
 Proyek Saluran Air di Jl Kapuk Raya Mubazir

Worthless, Water Channel Repair Project on Jalan Kapuk Raya

The Rp 2.6 billion repair project of water channel on Jalan Kapuk Raya, Kapuk Urban Village, West Jakarta, does not give any effect in solving flood problem in the area. As a proof, when rain pours, the road is still inundated up to 25 centimeters high.

The water channel repair project is worthless. The rain was not long, but the road was already inundated for 25 centimeters high

“The water channel repair project is worthless. The rain was not long, but the road was already inundated for 25 centimeters high. If the rain was long and heavy, imagine how high the flood would be,” expressed Chief of RW 01 Kapuk, Rinan (50), Friday (11/14).

According to him, the project was carried out in 2013. At that time, all water channels were replaced with U-shape concrete blocks. Unfortunately, the work was done carelessly.

16 Flood Control Pumps in North Jakarta Damaged

“The water channel repair also has impact to Kampung Apung condition. Since the work was done carelessly, the water at Kampung Apung is still not receding until now. Whereas, the plan was if the water channel was good, the water at Kampung Apung would flow into the channel. But in reality, Kampung Apung is still inundated,” said Rinan.

Responding on this matter, Head of the West Jakarta Water Management Public Works Sub-Department, Pamudji, explained that originally the repair project of water channel on Jalan Kapuk Raya was expected would make the water inundating Kampung Apung recede.

“We’ve repaired the water channel. The road is probably inundated because of its low position, which should be heightened. Besides, the area is also prone to tidal flood,” he stated.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1143 personFolmer
  2. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye857 personAldi Geri Lumban Tobing
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye701 personAldi Geri Lumban Tobing
  4. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye696 personBudhi Firmansyah Surapati
  5. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye641 personDessy Suciati