You don't have javascript enabled. Good luck with that.
Pencarian
15 Personil SDA dan PPSU Dikerahkan Atasi Tanah Longsor di Pondok Pinang

15 Personnel Deployed to Handle Landslides in Pondok Pinang

The next action is we install a dolken alcove. Then excavation of the soil for making sheet piles to be stronger

As many as 15 personnel of Water Resources (SDA) Task Force and PPSU are deployed to handle the collapsed Kali Pesanggrahan Riverbank in landslides, Pondok Pinang Urban Village area Kebayoran Lama, South Jakarta.

South Jakarta SDA Sub-agency Head, Mustajab explained that the incident was the aftermath of the collapsed back of a resident's house in RT 15/08 Pondok Pinang Urban Village, Monday (5/17). It damaged a kitchen, two storerooms and two bathrooms.

Collapsed Sheet Pile in Batu Ampar will Be Repaired Soon

He explained personnel had been sent to clean up building debris blocking the water flow of the river.

To anticipate similar case, heaps of sacks filled with stones were made and placed along the area affected by the landslide.

"The next action is we install a dolken alcove. Then excavation of the soil for making sheet piles to be stronger," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1945 personAldi Geri Lumban Tobing
  2. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1028 personDessy Suciati
  3. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye870 personAldi Geri Lumban Tobing
  4. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye793 personDessy Suciati
  5. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye754 personFakhrizal Fakhri