You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Tanggul di Kembangan Rampung

Repair of Kali Angke River Embankment in Kembangan Selatan Completed

The Kembangan Sub-district Water Resources (SDA) Executing Unit, West Jakarta has completed repairing the damaged embankment of the Kali Angke River, Jalan H Jafar, RT 06/01, Kembangan Selatan Urban Village.

Alhamdulillah, today, the repair is finished already

Mulyadi, Executing Unit Head of Kembangan Sub-district SDA said the repair started on February 8 was conducted to follow up on resident reports. The damage was because of landslides after being hit by the flow of river water.

"To conduct it, we have sent 20 personnel to the location. Alhamdulillah, today, the repair is finished already," he expressed, Thursday (3/4).

Damaged Barrier for Embankment on Pramuka Island Repaired Completely

He added the length of the repaired embankment was 23 meters, with 410 centimeters width and 270 centimeters height.

"Hopefully the same incident can be anticipated in the future," he hoped.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye416 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close