You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Longsor Jalan J Mulai Diperbaiki

Collapsed Retaining Wall on Jl. J Kebon Jeruk is Repaired

Kebon Jeruk Water Resources (SDA) Unit repaired collapsed retaining wall on Jl. J, RW 12, Kebon Jeruk Urban Village, Kebon Jeruk, West Jakarta. This repair work was targeted to finish until the next three weeks.

The damaged part is as long as 33.5 meters with channel's width 80 centimeters

Kebon Jeruk Sub-district SDA Unit Head, Suprapto stated, repair was carried out to follow up resident's report through CRM application.

Repair on Retaining Wall and Embankment of Cipinang River in Kelapa Dua Wetan is Completed

"Its condition is already collapsed and its debris clogged the channel. In this channel, water flows to Pesanggrahan River," he explained, Friday (6/25).

In order to repair it, his side deployed 12 personnel from Kebon Jeruk Sub-district SDA Unit.

"The damaged part is as long as 33.5 meters with channel's width 80 centimeters," he conveyed.

With this repair, he hoped buildings above the channel can be safe and water can flow better.

"We hope it will not collapse again. We also expect water to flow well in this channel," he mentioned.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye944 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye852 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye658 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye529 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye520 personAldi Geri Lumban Tobing