You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Breakwater di Sisi Timur Laut Pulau Untung Jawa Rampung

Breakwater Repair Work in Northeast Side of Untung Jawa Island Completed

Thousand Islands Water Resources (SDA) Sub-agency completed breakwater repair in the northeast side of Untung Jawa Island, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

We rearrange 249 tetrapods thus it can withstand the waves well

Thousand Islands SDA Sub-agency Head, Hendri conveyed, in this repair, his side rearranged the disordered tetrapods along more than 600 meters because of wave.

"We rearrange 249 tetrapods thus it can withstand the waves well. This work has been started since last week and completed yesterday," he mentioned, Friday (7/2).

Breakwater Repair Work on East Side of Karya Island Has Reached 80 Percent

In this breakwater repair work, his side deployed 14 personnel as well as raft and one heavy equipment ship unit.

"After rearranging tetrapods, we hope it can be stronger to hold high waves and prevent abrasion," he conveyed.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye740 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye620 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye568 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye529 personFakhrizal Fakhri
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye505 personAldi Geri Lumban Tobing