You don't have javascript enabled. Good luck with that.
Pencarian
Petugas SDA Lakukan Perawatan Tanggul Sepanjang Ratusan Meter di Pulau Untung Jawa
.
photo Suparni - Beritajakarta.id

Untung Jawa Island Breakwaters are Being under Maintenance

It is targeted to be complete by the end of this May

The Thousand Islands Water Resources (SDA) Sub-agency is conducting maintenance on breakwaters in Untung Jawa Island Urban Village, South Thousand Islands Sub-district, Thousand Islands.

Thousand Islands SDA Sub-agency Head, Hendri said the maintenance included patching the perforated breakwater surface and painting.

Collapsed Breakwater on East Side of Panggang Island Repaired

"It is focused on the Untung Jawa Island Main Pier as long as 224 meters and in the front of SDN 01 Pulau Untung Jawa as long as 142.8 meters and 1.23 meters width," he expressed, Thursday (5/27).

He explained it had been ongoing since May 26 and involved eight personnel.

"It is targeted to be complete by the end of this May," he stated.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye794 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye776 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye476 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye373 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye331 personTP Moan Simanjuntak