You don't have javascript enabled. Good luck with that.
Pencarian
Petugas SDA Lakukan Perawatan Tanggul Sepanjang Ratusan Meter di Pulau Untung Jawa
.
photo Suparni - Beritajakarta.id

Untung Jawa Island Breakwaters are Being under Maintenance

It is targeted to be complete by the end of this May

The Thousand Islands Water Resources (SDA) Sub-agency is conducting maintenance on breakwaters in Untung Jawa Island Urban Village, South Thousand Islands Sub-district, Thousand Islands.

Thousand Islands SDA Sub-agency Head, Hendri said the maintenance included patching the perforated breakwater surface and painting.

Collapsed Breakwater on East Side of Panggang Island Repaired

"It is focused on the Untung Jawa Island Main Pier as long as 224 meters and in the front of SDN 01 Pulau Untung Jawa as long as 142.8 meters and 1.23 meters width," he expressed, Thursday (5/27).

He explained it had been ongoing since May 26 and involved eight personnel.

"It is targeted to be complete by the end of this May," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye925 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye390 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti