You don't have javascript enabled. Good luck with that.
Pencarian
Breakwater Roboh di Pulau Karya Diperbaiki
.
photo Suparni - Beritajakarta.id

Breakwater Repair Work on East Side of Karya Island Has Reached 80 Percent

Our target is in two days ahead. Hopefully it can protect the Karya Island from abrasion and high waves

The Thousand Islands Water Resources (SDA) Sub-agency is seen repairing the damaged breakwater on the east side of Karya Island, Panggang Island Urban Village, North Thousand Islands Sub-district. Currently the progress has reached 80 percent.

Thousand Islands SDA Sub-agency Head, Hendri said the repairs carried out by the officers included rearranging the massive cube that collapsed due to the brunt of the high waves some time ago. Then the massive cube was tied with alternating wire to make it strong and sturdy.

Untung Jawa Island Breakwaters are Being under Maintenance

"The repair that takes 210 meters long has been conducted since early June," he expressed, Friday (6/4).

To conduct it, his side had deployed as many as 10 personnel to the location.

"Our target is in two days ahead. Hopefully it can protect the Karya Island from abrasion and high waves," he stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1205 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1049 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye903 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye728 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye568 personDessy Suciati