You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Air di Kebon Kosong Rampung

Channels Construction at Angkasa Pura Complex Completed

Central Jakarta Water Resources Sub-agency (SDA) has completed water channels construction project on Angkasa Pura Housing Complex road, RW 06, Kebon Kosong Urban Village, Kemayoran.

There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells

Kemayoran Sub-district SDA Executing Unit Head, Supriyadi said, it was carried out on August 13 and was completed on September 24. Around the location, it would be followed by the construction of infiltration wells.

"There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells," he expressed, Wednesday (9/29).

October, Water Channel Construction on Jalan Kikir Completed

He stated, the channel was built as rainwater often overflows onto the road when it rains heavily. It was made to 45.5 meters length with bottom width around 95 centimeters and upper width around 130 centimeters and one meter height.

"We do it manually using an excavator plus nine officers for maximum results," he stated.

Linked News
Popular News indeks
  1. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1309 personAldi Geri Lumban Tobing
  2. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1223 personAldi Geri Lumban Tobing
  3. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1037 personFolmer
  4. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye964 personDessy Suciati
  5. Pram Inaugurates Matraman Health Center, Calls for Seamless Public Service

    access_time05-06-2026 remove_red_eye794 personDessy Suciati