You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Air di Kebon Kosong Rampung

Channels Construction at Angkasa Pura Complex Completed

Central Jakarta Water Resources Sub-agency (SDA) has completed water channels construction project on Angkasa Pura Housing Complex road, RW 06, Kebon Kosong Urban Village, Kemayoran.

There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells

Kemayoran Sub-district SDA Executing Unit Head, Supriyadi said, it was carried out on August 13 and was completed on September 24. Around the location, it would be followed by the construction of infiltration wells.

"There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells," he expressed, Wednesday (9/29).

October, Water Channel Construction on Jalan Kikir Completed

He stated, the channel was built as rainwater often overflows onto the road when it rains heavily. It was made to 45.5 meters length with bottom width around 95 centimeters and upper width around 130 centimeters and one meter height.

"We do it manually using an excavator plus nine officers for maximum results," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye672 personTiyo Surya Sakti
  3. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye369 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close