You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Air di Kebon Kosong Rampung

Channels Construction at Angkasa Pura Complex Completed

Central Jakarta Water Resources Sub-agency (SDA) has completed water channels construction project on Angkasa Pura Housing Complex road, RW 06, Kebon Kosong Urban Village, Kemayoran.

There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells

Kemayoran Sub-district SDA Executing Unit Head, Supriyadi said, it was carried out on August 13 and was completed on September 24. Around the location, it would be followed by the construction of infiltration wells.

"There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells," he expressed, Wednesday (9/29).

October, Water Channel Construction on Jalan Kikir Completed

He stated, the channel was built as rainwater often overflows onto the road when it rains heavily. It was made to 45.5 meters length with bottom width around 95 centimeters and upper width around 130 centimeters and one meter height.

"We do it manually using an excavator plus nine officers for maximum results," he stated.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye741 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye621 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye569 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye529 personFakhrizal Fakhri
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye505 personAldi Geri Lumban Tobing