You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Air di Kebon Kosong Rampung

Channels Construction at Angkasa Pura Complex Completed

Central Jakarta Water Resources Sub-agency (SDA) has completed water channels construction project on Angkasa Pura Housing Complex road, RW 06, Kebon Kosong Urban Village, Kemayoran.

There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells

Kemayoran Sub-district SDA Executing Unit Head, Supriyadi said, it was carried out on August 13 and was completed on September 24. Around the location, it would be followed by the construction of infiltration wells.

"There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells," he expressed, Wednesday (9/29).

October, Water Channel Construction on Jalan Kikir Completed

He stated, the channel was built as rainwater often overflows onto the road when it rains heavily. It was made to 45.5 meters length with bottom width around 95 centimeters and upper width around 130 centimeters and one meter height.

"We do it manually using an excavator plus nine officers for maximum results," he stated.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1760 personFakhrizal Fakhri
  2. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1479 personFakhrizal Fakhri
  3. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye1072 personBudhi Firmansyah Surapati
  4. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1064 personFakhrizal Fakhri
  5. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye983 personNurito