You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Tali Air Taman Marto Hampir Rampung

Gutter Built in Taman Marto to Block Flooding

The Kemayoran Sub-district Bina Marga Executing Unit, Central Jakarta has started building a gutter in Taman Marto, Jalan Sunter Kemayoran, RW 09, Kebon Kosong Urban Village.

It is built to 22 meters long wit 60 centimeters wide and 30 centimeters high

Kemayoran Sub-district Bina Marga Executing Unit, Rumondang Tambunan said, it was carried out to anticipate flooding and to smoothen the flow of water to Sunter River.

"It is built to 22 meters long wit 60 centimeters wide and 30 centimeters high," he expressed, Wednesday (11/17).

Gutter alongside Jalan Jembatan Galur Being Fixed

He said, its existence would be used to accommodate garbage when it enters the gutter. This work involved seven personnel using manual tools such as crowbars, buckets, sacks, etc.

"It has been carried out since Friday and needs four days for completion. We have spent 40 sandbags and five sacks of cement. The gutter wall uses paving blocks left over from road repairs," he stated.

Hopefully, it could smoothen the flow of water, especially during heavy rains and minimize flooding.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye946 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye664 personAldi Geri Lumban Tobing
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye539 personAldi Geri Lumban Tobing
  4. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye536 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye487 personFolmer