You don't have javascript enabled. Good luck with that.
Pencarian
Dishub Rekayasa Lalin di Simpang Thamrin Mulai 5 Februari 2022

Starting Tomorrow, Traffic Engineering will Be Implemented at Kebon Sirih-MH Thamrin Intersection

The Jakarta Transportation Agency (Dishub) has applied a traffic engineering on Jalan Kebon Sirih and Jalan M.H. Thamrin due to the continuation of the Mass Rapid Transit (MRT) Phase 2 CP-201 work.

In order to support the work, traffic engineering will be carried out in stages

The construction work will take place on February 5 - May 31, 2022 at the intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin.

Jakarta Dishub Head, Syafrin Liputo conveyed, the project is related to soil stability improvement method, construction on the east side of diaphragm walls, temporary girders installation, deck construction, and excavation work for Thamrin MRT Station.

End of November, TBM 1 for MRT Phase 2A Project will Be Transported to Bundaran HI Station

"Traffic engineering will be carried out in stages," he said, Friday (2/4).

He explained that the construction on the east side of south segment of Tugu Jam will start from February 5 to April 3. Therefore, traffic flow from west (Tanah Abang) to east (Senen) can still pass through the intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam).

Meanwhile, the work on the east side of north segment of Tugu Jam will take place from April 4 to May 31. During the period, traffic flow from west (Tanah Abang) to east (Senen) will be diverted through the south side of Tugu Jam at intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin.

The following is detailed information about traffic engineering applied during construction work:

- Vehicles from east (Jalan Kebon Sirih to west (Tanah Abang) which originally crossed the intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam) will be directed to turn left at Bundaran HI.

- Vehicles from east (Jalan Merdeka Selatan to west (Tanah Abang) which originally crossed intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam) will be diverted via Jalan Budi Kemuliaan - Jalan Abdul Muis

- Vehicles from east (Jl. K.H. Wahid Hasyim) to west (Tanah Abang) which originally crossed intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam) will be diverted to go straight through Jalan K.H. Wahid Hasyim.

- Vehicles from south (Jalan H. Agus Salim) to west (Tanah Abang) which originally crossed intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam) will be diverted to turn left via Jalan K.H. Wahid Hasyim.

- Transjakarta 5M bus for Kampung Melayu Terminal-Tanah Abang route which originally crossed intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam) will be diverted via Jalan Budi Kemuliaan - Jalan Abdul Muis.

- Transjakarta 1R bus for Senen Terminal-Tanah Abang route which originally crossed intersection of Jalan Kebon Sirih - Jalan M.H. Thamrin (Tugu Jam) will be diverted via Jalan Budi Kemuliaan - Jalan Abdul Muis.

"We call on road users to follow the routes that have been set. Make sure to obey traffic signs and put safety on the road first," he asserted.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1058 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye994 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye966 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye928 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye707 personAldi Geri Lumban Tobing