You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan di Cilangkap Diuji Coba

Infiltration Wells in Cilangkap are in Trial

The 18-meter-deep infiltration well, which is built on Jalan Giri Kenyan, RT 06/02, Cilangkap, East Jakarta is under a trial stage led by Cilangkap Urban Village Head, Nasir Sugiar, on Sunday (2/6).

Hope they are able to handle inundation and become a reservoir of clean water during the dry season

There were also representatives of Jakarta Water Resources (SDA) Agency, apparatuses of urban village and sub-district, caretakers of RT/RW, LMK, local public figures.

During the trial, the well was sprayed with water from a 5,000-liter-capacity tank. Within an hour, the 5,000 liters of water was completely absorbed into the ground through the well.

RW 01 Rawa Bunga Urban Village Residents Feel Benefits of Infiltration Wells

"It aims to ensure that the well is effective to overcome inundation," he stated.

He explained that there were 40 wells built in RW 02 area. Five of them were drilled to 18 meters deep. While the other 35 wells were drilled to three meters.

"This is also used for the stock of clean water reserves," he said.

LMK RW 02 Member, Come. Pol. Suharno, appreciated it. Of the five wells, two were in the front of RW 02 Secretariat and in the front of TK Giri Kencana, as well as on Jalan Giri Kenyan RT 06/02.

"Thanks to the Jakarta administration that has made these wells. Hope they are able to handle inundation and become a reservoir of clean water during the dry season. Thus residents do not lack clean water," he said.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye775 personDessy Suciati
  2. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye565 personAnita Karyati
  3. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye558 personAldi Geri Lumban Tobing
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye535 personFakhrizal Fakhri
  5. Jakarta Logs 0.13% Inflation as Chicken, Chili, and Rice Push Prices Up

    access_time03-10-2026 remove_red_eye533 personFakhrizal Fakhri