You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Saluran Air di Kebon Nanas Rampung
....
photo Nurito - Beritajakarta.id

New Water Channel Built in Kebon Nanas

The construction of a 110-meter channel on Jalan Panca Warga 3 which located in front of the Kebon Nanas Public Cemetery (TPU), RT 04/05 Cipinang Besar Selatan, Jatinegara, East Jakarta, finally completed.

The new 35-meter channel uses U-ditch concrete in the size of 60x50 centimeters

Jatinegara Sub-district Water Resources (SDA) Unit Coordinator, Tamrizal mentioned the construction took more than two months. It involved 15 personnel to dig land on the side of the road using hoes, crowbars, and other tools.

"The new 35-meter channel uses U-ditch concrete in the size of 60x50 centimeters. Previously, there was no channel, so we build a new one. It is connected to the existing channel at TPU intersection," he said, Saturday (3/12).

Tomang Flood Canal Connecting Channel Dredged along 200 Meters

His side also completed the repair work of four sheet piles in RW 10, Cipinang Muara.

It was executed by 30 personnel in several points, namely in RT 01, 04, 08, and 10/RW 10 Cipinang Elok with a length of 10 meters, 13 meters, 15 meters, and 35 meters.

"We repair them more than a month using river stones," he explained.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1207 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1052 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye905 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye730 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye577 personDessy Suciati