You don't have javascript enabled. Good luck with that.
Pencarian
SDA Akan Bangun Crossing di Komplek Statistik

East Jakarta SDA to Build Crossing Channel in Statistik Housing Complex

The East Jakarta Water Resources (SDA) Sub-agency is going to build a crossing channel or locally known as sodetan in the Statistik Housing Complex, Pondok Bambu, Duren Sawit, East Jakarta, which aims to minimize inundation on Jalan Statistik RT 16/07.

The channel will have about 300 meters 

Maintenance Division Head Puryanto said he had coordinated with the Statistic Center (BPS) side as the owner first before building the channel.

"The channel will have about 300 meters in length with dimensions of 1.5x1.5 square meters using U-ditch," he said, Thursday (3/17).

Crossing Channel Built in Kampung Nelayan Kamal Muara

According to him, it would be made to connect the outlets of the H. Dogol Reservoir to the Teluk Sibolga Connecting Channel.

While waiting for the communication process with BPS, his party carried out the measurement and mapping of the land first.

"This work will be handed to the third party with e-catalog system," he concluded.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1062 personFakhrizal Fakhri
  2. Pramono Encourages Residents to Stay Active at Rasuna Said CFD

    access_time26-07-2026 remove_red_eye638 personFolmer
  3. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye586 personBudhi Firmansyah Surapati
  4. Pramono Praises Young Innovators at the Jakarta Robotic Games 2026

    access_time28-07-2026 remove_red_eye462 personDessy Suciati
  5. Various Events Prepared for Jakarta`s 5th Century Anniversary

    access_time29-07-2026 remove_red_eye460 personFakhrizal Fakhri