You don't have javascript enabled. Good luck with that.
Pencarian
Crossing Saluran Jl Biola Pegangsaan Dua Diperbesar
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Channel Crossing Capacity on Jalan Biola is Upgraded

The North Jakarta Water Resources (SDA) Sub-agency has started upgrading the channel crossing capacity on Jalan Biola, RW 06, Pegangsaan Dua Urban Village, Kelapa Gading Sub-district.

It is targeted for completion by early September 2022

Kelapa Gading Sub-district SDA Executing Unit Head Citrin Indarwati said that the upgrading work was to follow up on the recess of Jakarta DPRD members. Previously, the area was often inundated during heavy rains.

"Channel crossings need elevation and widening to avoid overflowing water," he expressed, Thursday (8/25).

This Week, Channel Dredging in Kemanggisan Ilir Completed

According to him, it was carried out to accommodate rainwater optimally and smoothen the flow of water in the channel on Jalan Bangun Cipta Sarana and its surrounding areas. Technically, the upgrading of crossing capacity has one meter wide and 9.2 meters long.

It has been ongoing since Tuesday (8/9). Besides sending seven workers, heavy equipment was also alerted at the location.

"It is targeted for completion by early September 2022," he stated.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye793 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye771 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye474 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye373 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye322 personTP Moan Simanjuntak