You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Phb Pejompongan Capai 10 Persen

Pejompongan Connecting Channel Being Dredged from Mud

The Central Jakarta Water Resources (SDA) Sub-agency is dredging the Pejompongan Connecting Channel on Jalan Pejompongan 3B, Benhil, Tanah Abang.

It has been ongoing since January 26 and is targeted to be completed in seven days ahead

Tanah Abang Sub-district SDA Executing Unit Head, Eli Menawan Sari expressed the dredging work is carried out along 70 meters with 130 centimeters wide and high.

"It has been ongoing since January 26 and is targeted to be completed in seven days ahead," she expressed, Saturday (1/28).

Channel Dredging Work on Jalan Teuku Cik Ditiro Being Accelerated

She explained that it involved six workers. Until today, they managed to pick up 7.28 cubic meters of mud from the channel.

"The progress so far has touched 10 percent or 14 meters long," he closed.

Linked News
Popular News indeks
  1. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye541 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye539 personAldi Geri Lumban Tobing
  3. BI and Jakarta Government Deepen Investment, Creative Economy Collaboration

    access_time09-11-2026 remove_red_eye539 personAldi Geri Lumban Tobing
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye533 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye511 personTiyo Surya Sakti