You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Phb Pejompongan Capai 10 Persen

Pejompongan Connecting Channel Being Dredged from Mud

The Central Jakarta Water Resources (SDA) Sub-agency is dredging the Pejompongan Connecting Channel on Jalan Pejompongan 3B, Benhil, Tanah Abang.

It has been ongoing since January 26 and is targeted to be completed in seven days ahead

Tanah Abang Sub-district SDA Executing Unit Head, Eli Menawan Sari expressed the dredging work is carried out along 70 meters with 130 centimeters wide and high.

"It has been ongoing since January 26 and is targeted to be completed in seven days ahead," she expressed, Saturday (1/28).

Channel Dredging Work on Jalan Teuku Cik Ditiro Being Accelerated

She explained that it involved six workers. Until today, they managed to pick up 7.28 cubic meters of mud from the channel.

"The progress so far has touched 10 percent or 14 meters long," he closed.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye811 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye590 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye584 personAldi Geri Lumban Tobing
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye500 personAnita Karyati
  5. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye485 personDessy Suciati