You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Phb Pejompongan Capai 10 Persen

Pejompongan Connecting Channel Being Dredged from Mud

The Central Jakarta Water Resources (SDA) Sub-agency is dredging the Pejompongan Connecting Channel on Jalan Pejompongan 3B, Benhil, Tanah Abang.

It has been ongoing since January 26 and is targeted to be completed in seven days ahead

Tanah Abang Sub-district SDA Executing Unit Head, Eli Menawan Sari expressed the dredging work is carried out along 70 meters with 130 centimeters wide and high.

"It has been ongoing since January 26 and is targeted to be completed in seven days ahead," she expressed, Saturday (1/28).

Channel Dredging Work on Jalan Teuku Cik Ditiro Being Accelerated

She explained that it involved six workers. Until today, they managed to pick up 7.28 cubic meters of mud from the channel.

"The progress so far has touched 10 percent or 14 meters long," he closed.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1057 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye993 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye965 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye925 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye705 personAldi Geri Lumban Tobing