You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Bangun Sumur Resapan di Pulau Harapan

More Biopores Built to Minimize Flooding on Harapan Island

The Seribu Islands Water Resources (SDA) Sub-agency has again built an infiltration well and two biopore holes at RT 05/01, Harapan Island, North Seribu Islands.

This aims to minimize inundation when it rains

Harapan Island SDA Sub-agency Coordinator, Ganda expressed that the infiltration well and biopore hole construction has been ongoing since Friday (9/29). It involved three personnel.

"It is one of the best possible solutions to flooding," he expressed, Monday (10/2).

Infiltration Wells and Biopore Holes in Pramuka Island Cleaned Up

He explained the infiltration well would have a diameter of 30x30 centimeters with a depth of up to 50 centimeters, while the biopore holes would have a width of 35 centimeters using a four-inch pipe.

"Overall, there are 69 spots of wells on Harapan Island spread across three RWs," he explained.

Harapan Island Urban Village Head, Muhammad Yusup appreciated the SDA personnel who were active, fast, and neat in building infiltration wells and biopore holes in his region.

"Hopefully, it can speed up rainwater infiltration," he stated.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1297 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1128 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye292 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing