You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Bangun Sumur Resapan di Pulau Harapan

More Biopores Built to Minimize Flooding on Harapan Island

The Seribu Islands Water Resources (SDA) Sub-agency has again built an infiltration well and two biopore holes at RT 05/01, Harapan Island, North Seribu Islands.

This aims to minimize inundation when it rains

Harapan Island SDA Sub-agency Coordinator, Ganda expressed that the infiltration well and biopore hole construction has been ongoing since Friday (9/29). It involved three personnel.

"It is one of the best possible solutions to flooding," he expressed, Monday (10/2).

Infiltration Wells and Biopore Holes in Pramuka Island Cleaned Up

He explained the infiltration well would have a diameter of 30x30 centimeters with a depth of up to 50 centimeters, while the biopore holes would have a width of 35 centimeters using a four-inch pipe.

"Overall, there are 69 spots of wells on Harapan Island spread across three RWs," he explained.

Harapan Island Urban Village Head, Muhammad Yusup appreciated the SDA personnel who were active, fast, and neat in building infiltration wells and biopore holes in his region.

"Hopefully, it can speed up rainwater infiltration," he stated.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye2184 personAldi Geri Lumban Tobing
  2. Betawi Eid in Ciganjur Goes Lively

    access_time02-05-2026 remove_red_eye2152 personTiyo Surya Sakti
  3. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye1954 personDessy Suciati
  4. Malaka Jaya Residents Take Part in Waste Sorting Program

    access_time03-05-2026 remove_red_eye1925 personNurito
  5. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye1909 personAldi Geri Lumban Tobing