You don't have javascript enabled. Good luck with that.
Pencarian
SDA Jakbar Perbaiki Sheetpile Bocor Kali Angke di Rawabuaya

Angke River Sheet Pile in West Jakarta Being Repaired

The West Jakarta Water Resources (SDA) Sub-agency has repaired the Angke River sheet pile, which was leaking and seeping at RT 13/04, Rawa Buaya Urban Village, Cengkareng Sub-district.

We deploy ten personnel to the location

West Jakarta SDA Sub-agency Head, Purwanti said the leaking and seeping sheet pile occurred during the heavy rain that occurred four days ago, causing the river to overflow and inundate residential areas.

"We deploy ten personnel to the location and the repair has been ongoing since two days," she expressed, Tuesday (1/9).

Kali Baru Sheet Pile Construction Being Built to Handle Flooding In Tengah Area

According to her, it was conducted using cement mortar and bricks to cover four leaking sheet pile points.

"Currently, the leaking point has been sealed tightly," she stated.

RT 13/04 Chairman, Rawa Buaya Urban Village, M Nahrowi (53), appreciated the personnel's quick response who repaired the Angke River sheet pile.

"It causes inundation in the residential areas due to heavy rain sometimea ago," he added.

Hence, residents expressed their gratitude and appreciation to the ranks of the West Jakarta SDA Sub-agency who had repaired the Angke River sheet pile in their area.

"Hopefully, it can minimize flooding when it rains," he hoped.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1544 personFakhrizal Fakhri
  2. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1158 personDessy Suciati
  3. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye947 personNurito
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye941 personBudhi Firmansyah Surapati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye847 personDessy Suciati