You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Jl Lingkar Luar Barat Tuntas Dikerjakan

Water Channel Construction on Jalan Lingkar Luar Barat Completed

West Jakarta Water Resources Sub-agency has completed the construction of water channel on Jalan Lingkar Luar Barat from Kapuk to Cengkareng direction, Cengkareng Timur Urban Village, Cengkareng Sub-district.

will flow the water smoothly

Sub-agency Head, Purwanti, said the construction was completed along 204 meters. The work was started in August 2023.

Next Week, Collapsed Channel in Baru Urban Village Replaced with U-Ditch Concrete

"Now the work has been completed in first week of January 2024," she said, Saturday (1/13).

According to her, the new 60x80 cm water channel is also completed with u-ditch. The work involved 10 sub-agency's personnel equipped with one heavy equipment.

"It is hoped the new water channel will flow the water smoothly into the connecting channel and minimize inundation," she added.

Boy Sugiyanto (46), local resident, thanked the agency for the new water channel.

"Our people here hope there will be no more inundation during heavy rain," he hoped.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye876 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye595 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye564 personDessy Suciati
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye560 personFakhrizal Fakhri
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye524 personAldi Geri Lumban Tobing