You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Jl Lingkar Luar Barat Tuntas Dikerjakan

Water Channel Construction on Jalan Lingkar Luar Barat Completed

West Jakarta Water Resources Sub-agency has completed the construction of water channel on Jalan Lingkar Luar Barat from Kapuk to Cengkareng direction, Cengkareng Timur Urban Village, Cengkareng Sub-district.

will flow the water smoothly

Sub-agency Head, Purwanti, said the construction was completed along 204 meters. The work was started in August 2023.

Next Week, Collapsed Channel in Baru Urban Village Replaced with U-Ditch Concrete

"Now the work has been completed in first week of January 2024," she said, Saturday (1/13).

According to her, the new 60x80 cm water channel is also completed with u-ditch. The work involved 10 sub-agency's personnel equipped with one heavy equipment.

"It is hoped the new water channel will flow the water smoothly into the connecting channel and minimize inundation," she added.

Boy Sugiyanto (46), local resident, thanked the agency for the new water channel.

"Our people here hope there will be no more inundation during heavy rain," he hoped.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1275 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1257 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1245 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1061 personNurito
  5. Jakarta KPU Records More Than 8.2 Million Registered Voters

    access_time06-07-2026 remove_red_eye995 personFolmer