You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Jl Lingkar Luar Barat Tuntas Dikerjakan

Water Channel Construction on Jalan Lingkar Luar Barat Completed

West Jakarta Water Resources Sub-agency has completed the construction of water channel on Jalan Lingkar Luar Barat from Kapuk to Cengkareng direction, Cengkareng Timur Urban Village, Cengkareng Sub-district.

will flow the water smoothly

Sub-agency Head, Purwanti, said the construction was completed along 204 meters. The work was started in August 2023.

Next Week, Collapsed Channel in Baru Urban Village Replaced with U-Ditch Concrete

"Now the work has been completed in first week of January 2024," she said, Saturday (1/13).

According to her, the new 60x80 cm water channel is also completed with u-ditch. The work involved 10 sub-agency's personnel equipped with one heavy equipment.

"It is hoped the new water channel will flow the water smoothly into the connecting channel and minimize inundation," she added.

Boy Sugiyanto (46), local resident, thanked the agency for the new water channel.

"Our people here hope there will be no more inundation during heavy rain," he hoped.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1899 personAldi Geri Lumban Tobing
  2. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1022 personDessy Suciati
  3. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye859 personAldi Geri Lumban Tobing
  4. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye789 personDessy Suciati
  5. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye662 personFakhrizal Fakhri