You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Jl Lingkar Luar Barat Tuntas Dikerjakan

Water Channel Construction on Jalan Lingkar Luar Barat Completed

West Jakarta Water Resources Sub-agency has completed the construction of water channel on Jalan Lingkar Luar Barat from Kapuk to Cengkareng direction, Cengkareng Timur Urban Village, Cengkareng Sub-district.

will flow the water smoothly

Sub-agency Head, Purwanti, said the construction was completed along 204 meters. The work was started in August 2023.

Next Week, Collapsed Channel in Baru Urban Village Replaced with U-Ditch Concrete

"Now the work has been completed in first week of January 2024," she said, Saturday (1/13).

According to her, the new 60x80 cm water channel is also completed with u-ditch. The work involved 10 sub-agency's personnel equipped with one heavy equipment.

"It is hoped the new water channel will flow the water smoothly into the connecting channel and minimize inundation," she added.

Boy Sugiyanto (46), local resident, thanked the agency for the new water channel.

"Our people here hope there will be no more inundation during heavy rain," he hoped.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye749 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye700 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye665 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye524 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye492 personAldi Geri Lumban Tobing