You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kolam Retensi Taman Sepat Terus Dioptimalkan

Mud Dredging at Sepat Park Retention Pool Accelerated

The South Jakarta Water Resources Sub-agency (SDA) is speeding up the mud dredging process at the Taman Sepat Retention Pool, Kebagusan, Pasar Minggu.

Every day, personnel can dredge 50 cubic meters of mud

South Jakarta SDA Sub-agency's Heavy Equipment Monitoring Officer, Mahardika said the dredging was conducted to anticipate the buildup of mud and maximize Sepat Park's function as a retention pond.

"The thickness of the mud reaches one meter deep. However, our personnel only dredged it to 50 centimeters deep," he expressed, Monday (6/24).

PPSU Clean Waste from RW 03 Water Channel

He explained the dredging, which started on May 18, was targeted to be completed in the next one to three months.

"Every day, personnel can dredge 50 cubic meters of mud from this retention pond," he explained.

He hoped that it could restore the capacity of the retention pond to normal. So, it can reduce and overcome the potential for flooding in the area around Pasar Minggu.

"Hopefully, it can run smoothly and quickly," he stated.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye819 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye628 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye586 personAldi Geri Lumban Tobing
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye508 personAnita Karyati
  5. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye506 personDessy Suciati