You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kolam Retensi Taman Sepat Terus Dioptimalkan

Mud Dredging at Sepat Park Retention Pool Accelerated

The South Jakarta Water Resources Sub-agency (SDA) is speeding up the mud dredging process at the Taman Sepat Retention Pool, Kebagusan, Pasar Minggu.

Every day, personnel can dredge 50 cubic meters of mud

South Jakarta SDA Sub-agency's Heavy Equipment Monitoring Officer, Mahardika said the dredging was conducted to anticipate the buildup of mud and maximize Sepat Park's function as a retention pond.

"The thickness of the mud reaches one meter deep. However, our personnel only dredged it to 50 centimeters deep," he expressed, Monday (6/24).

PPSU Clean Waste from RW 03 Water Channel

He explained the dredging, which started on May 18, was targeted to be completed in the next one to three months.

"Every day, personnel can dredge 50 cubic meters of mud from this retention pond," he explained.

He hoped that it could restore the capacity of the retention pond to normal. So, it can reduce and overcome the potential for flooding in the area around Pasar Minggu.

"Hopefully, it can run smoothly and quickly," he stated.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1696 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye688 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye495 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye446 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye424 personDessy Suciati