You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kolam Retensi Taman Sepat Terus Dioptimalkan

Mud Dredging at Sepat Park Retention Pool Accelerated

The South Jakarta Water Resources Sub-agency (SDA) is speeding up the mud dredging process at the Taman Sepat Retention Pool, Kebagusan, Pasar Minggu.

Every day, personnel can dredge 50 cubic meters of mud

South Jakarta SDA Sub-agency's Heavy Equipment Monitoring Officer, Mahardika said the dredging was conducted to anticipate the buildup of mud and maximize Sepat Park's function as a retention pond.

"The thickness of the mud reaches one meter deep. However, our personnel only dredged it to 50 centimeters deep," he expressed, Monday (6/24).

PPSU Clean Waste from RW 03 Water Channel

He explained the dredging, which started on May 18, was targeted to be completed in the next one to three months.

"Every day, personnel can dredge 50 cubic meters of mud from this retention pond," he explained.

He hoped that it could restore the capacity of the retention pond to normal. So, it can reduce and overcome the potential for flooding in the area around Pasar Minggu.

"Hopefully, it can run smoothly and quickly," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1358 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1008 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye987 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye781 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye676 personDessy Suciati