You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kolam Retensi Taman Sepat Terus Dioptimalkan
....
photo Andri Widiyanto - Beritajakarta.id

Mud Dredging at Sepat Park Retention Pool Accelerated

The South Jakarta Water Resources Sub-agency (SDA) is speeding up the mud dredging process at the Taman Sepat Retention Pool, Kebagusan, Pasar Minggu.

Every day, personnel can dredge 50 cubic meters of mud

South Jakarta SDA Sub-agency's Heavy Equipment Monitoring Officer, Mahardika said the dredging was conducted to anticipate the buildup of mud and maximize Sepat Park's function as a retention pond.

"The thickness of the mud reaches one meter deep. However, our personnel only dredged it to 50 centimeters deep," he expressed, Monday (6/24).

PPSU Clean Waste from RW 03 Water Channel

He explained the dredging, which started on May 18, was targeted to be completed in the next one to three months.

"Every day, personnel can dredge 50 cubic meters of mud from this retention pond," he explained.

He hoped that it could restore the capacity of the retention pond to normal. So, it can reduce and overcome the potential for flooding in the area around Pasar Minggu.

"Hopefully, it can run smoothly and quickly," he stated.

Linked News
Popular News indeks
  1. UK Royal Marine Band Enlivens Jakarta Anniversary

    access_time27-06-2025 remove_red_eye470 personDessy Suciati
  2. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye415 personTiyo Surya Sakti
  3. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye371 personAldi Geri Lumban Tobing
  4. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye344 personAldi Geri Lumban Tobing
  5. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye334 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik