Environmental Road at RW 01 Cilangkap Asphalted
access_time July 15 2024 08:43 PM remove_red_eye 316
Reported by Nurito | Translated by Rizky Mawardi
Reported by Nurito | Translated by Rizky Mawardi
East Jakarta Bina Marga Sub-agency, Monday (7/15), was improving environmental road on Jalan Sepakat V, VI and IX RT 09/01 Cilangkap Urban Village, Cipayung.
the asphalting uses a baby roller
East Jakarta Bina Marga Sub-agency Head, Benhard Hutajulu, said the total length of roads paved at this location reaches 394 meters with an average width of 3.02 meters or if calculated, the area is around 1,189.9 square meters.
Road Repair on Jalan Jembatan Ciliwung Tanjung Barat CompletedAccording to Benhard, the existing condition of the asphalt has peeled off a lot so residents feel uncomfortable.
"Because the target is a neighborhood road, the asphalting uses a baby roller," said Benhard.
Meanwhile, RT 09/01 Head of Cilangkap Urban Village, Wahab, appreciated the Bina Marga sub-agency for asphalting the residential road.
"Thank God, the work is good and also fast and satisfying. Hopefully, residents will feel safe and comfortable after their neighborhood roads are paved," he admitted.