You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Saluran PHB Karang Bolong Terus Dikebut

Connecting Channel in Karang Bolong Dredged from Mud

The Pademangan Sub-district Water Resources Implementation Unit (SDA), North Jakarta is dredging mud in the Karang Bolong Connecting Channel, Jalan Karang Bolong, Ancol Urban Village.

It involves 13 personnel, one long-arm excavator, and three mud transport trucks

Pademangan Sub-district SDA Executing Unit Head, Dewi Marlina said the dredging is conducted to prevent flooding by increasing capacity and smoothing water flow.

"The rainy season will soon enter, we anticipate silting in this channel," She expressed, Friday (8/16).

Channel on Jalan Medan Merdeka Utara Dredged

She explained dredging was carried out along 619 meters with 70 centimeters deep.

"It involves 13 personnel, one long-arm excavator, and three mud transport trucks," she explained.

It has been conducted since July 5, 2024, and is targeted foe completion in September.

"The work progress has touched 40 percent. We have collected 1,139 cubic meters of mud from the channel and will be dumped at the Ancol PLTU dumping site," she uttered.

The work received appreciation from Pademangan Sub-agency Sub-district Head, Didit Mulyadi.

"Through the personnel' quick actions, any potential for inundation can be anticipated and handled properly," he stated.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1609 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye804 personBudhi Firmansyah Surapati
  3. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye661 personFolmer
  4. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye571 personAldi Geri Lumban Tobing
  5. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye564 personFakhrizal Fakhri