You don't have javascript enabled. Good luck with that.
Pencarian
May Day, Jalur Menuju Istana Dialihkan

Car Free Day Will Enliven Kota Tua This Sunday

West Jakarta Administration is about to hold the Car Free Day (HBKB) in Kota Tua, Sunday (5/17). To smoothen its implementation, the road diversion will be applied.

Alternative access has been prepared during Car Free Day this Sunday

The road diversion that started at 6-11 AM will be applied on Jalan Kali Besar Barat, Jalan Kali Besar Timur, Jalan Kunir, Jalan Kopi, and Jalan Pos Kota.

West Jakarta Transportation Sub-Department Head, Mirza Aryadi said his sub-department has prepared an altenative access that can be passed from the north side such as Jalan Bandengan Utara, Jalan Pejagalan, Jalan Bendera, Jalan Cengkeh, Jalan Kali Besar Timur, and Jalan Kunir.

Throw Politic Away from Car Free Day, Ahok Says

As for the south side, the motorist can pass through Jalan Pintu Besar Selatan or Jalan Jembatan Baru, Jalan Pintu Besar Utara, Jalan Bank, Jalan Malaka, Jalan Roa Malaka Selatan, Jalan Kopi, Jalan Pejagalan, and Jalan Bandengan Selatan.

"Alternative access has been prepared during Car Free Day this Sunday," he explained, Thursday (5/14).

In order to smoothen the event well, Aryadi added, local people urged to obey the traffic officer's direction in the field.

"We want people to obey the traffic sign and the officer's direction in the field," he disclosed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing