You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Saluran Air di Jalan Mawar Sudah 70 Persen

New Water Channel on Jalan Mawar Under Construction

A new water channel is being constructed on Jalan Mawar, RT 08/13, Bintaro Urban Village, Pesanggrahan Sub-district, aimed at addressing flooding issues.

It is very good and organized

"The work progress has touched 70 percent and is targeted to be completed by the end of this year," said Pesanggrahan Water Resources (SDA) Executing Unit Head, Chairul Anwar, Monday (7/21).

He explained, this 120-meter long water channel construction uses a 40-HD U-Ditch and has been underway since June 19, 2025. This is done manually with the involvement of four personnel.

Channel on Jalan Pondok Gede Finally Clean from Mud

He hoped that it could minimize flooding, especially when it rains.

"And also last long," he hoped.

The work received appreciation from one of the locals, Heru.

"It is very good and organized," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye354 personAldi Geri Lumban Tobing
close