You don't have javascript enabled. Good luck with that.
Pencarian
 179 Bangunan Liar di Kelurahan Duri Pulo Segera di Bongkar

Dirtying Water Channel, 179 Buildings will Be Disciplined After Eid ul-Fitr

The demolishment against 179 semi-permanent illegal buildings stood atop water channel on Jalan Subur Raya and Duri Raya, Duri Pulo Urban Village, Gambir, slated to be disciplined after Eid ul-Fitri.

We gave them a deadline until August 30, if it is not yet demolished, so we will do demolishment on September 2

Protest, Buildings Demolishment in Rawajati Delayed

During this time, those illegal buildings are used as residence, stall and workshop. Consequently, it looks slum and dirty.

Nur Komariyah, Head of Duri Pulo Urban Village acknowledged that socialization was already conducted to the building owners and they agreed. They were also given a chance to demolish their own building.

“We gave them a deadline until August 30, if it is not yet demolished, so we will do demolishment on September 2,” he asserted, Wednesday (7/1).

As planned, after demolishment, the Central Jakarta Water Management Sub-Department would normalize the channel as the site is often prone to flooding.

“Such channel is clogged and has never been dredged, that’s why it is often inundated,” he disclosed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1582 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1438 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1302 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1095 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye966 personDessy Suciati