You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan saluran air di Jalan Tipar sisi timur

Water Channel on Jalan Tipar Being Dredged

As many as 11 personnel of Cakung District's  Water Resources personnel, East Jakarta, are deployed to dredge a water channel on the east side of Jalan Tipar, RT 05/09, Cakung Barat Urban Village.

targeted for completion on December 4, 2025

Head Unit of Cakung District's Water Resources, Dian Nur Cahyono said the dredging of this micro channel is responding to local residents' requests.

Three Weeks, Dredging of Lenggong Connection Channel in Jagakarsa Completed

He said that the water channel is filled with mud and rubbish sedimentation with a thickness of around 45 centimeters, so it is unable to accommodate high volumes of water during heavy rain.

"The dredging has been running since November 14 and is targeted for completion on December 4, 2025," he said, Thursday (11/27).

The 60-centimeter-high and 80-centimeter-wide water channel is dredged for 50 meters. The work is carried out manually.

Meanwhile, member of LMK RW 09, Cakung Barat Urban Village, Ahmad Saugi Sahab appreciated the unit for responding to resident's request.

"Hopefully this channel can effectively prevent flooding in this area," he hoped.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye618 personDessy Suciati
  2. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye567 personAldi Geri Lumban Tobing
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye545 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye526 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye514 personNurito