You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Pengolahan Air laut Terkendala Anggaran

Sea Water Processing Project will Complete This Year

The project of processing sea water to be plain water in Karya Island, North Seribu Islands Sub-District.

There have been water well and warehouse, including pipeline, there are still pump and some installations left

Acting (Plt) of Seribu Islands Regency, Budi Utomo stated, currently it has been entering the step of warehouse construction and water reservoir tubs also water well located in the dock of Karya Island. 

"There have been water well and warehouse, including pipeline, there are still pump and some installations left," he explained, Monday (7/20). 

Jakpro and Pertamina Gear Up to Build PLTG

The project, he continued, was stopped due to the city budget was not disbursed yet. "Hopefully the project will be done this year," he hoped. 

According to him, plain water or drink water needs in Seribu Islands  is very vital, citizens at this time using ground water which is little brackish, yet really helpful for the locals. 

By the processing installation of sea water to be plain water, citizens are no longer having  water difficulty for cooking needs.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close