You don't have javascript enabled. Good luck with that.
Pencarian
Kolam Penahan Lumpur KBT Dikuras

East Flood Canal Sandtrap Dredged

Various ways to anticipate flood in capital keep being accelerated by Jakarta Water Management Department. One of them is by dredging the East Flood Canal (KBT) sandtrap in Cakung, East Jakarta.

We deepen it into four meters

A ​​300x500 meters pond in KBT is function to hold the mud flowing into the estuary. In the past year, almost all parts of the pool was filled with mud carried by the canal flow.

Head of Unit Equipment and Supplies (Alkal) for Jakarta Water Management Department, Aris Komaris Nandika stated that his side deployed five heavy equipments consist of two units long arm excavator, two amphibious excavator units and one dragger unit.

KBT will Be Transformed Into Culinary Tour Site

"The work has been carried out since two weeks ago," he said, Tuesday (8/18).

"We predict the work will be completed in October. We deepen it into four meters," he disclosed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye876 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye595 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye564 personDessy Suciati
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye559 personFakhrizal Fakhri
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye524 personAldi Geri Lumban Tobing