You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Krukut Rampung Dua Pekan

Dredging in Krukut River will Be Complete in 2 Weeks

Approaching rainy season, the Krukut River located at Jalan Bang Raya, Pulo Urban Village Kebayoran Baru, South Jakarta started being dredged.

The dredging will be complete in 2 weeks ahead

Head of South Jakarta Water Management Sub-Department, Dedy Budiwidodo stated, the dredging has been ongoing since 2 months ago.

"The dredging will be complete in 2 weeks ahead," he stated, Wednesday (9/30).

Water Management Dept. Socialized Sekretaris River Normalization

He hoped the river flow could be more maximal in future.

"There have thousands cubic of sediment dredged. The small islands are also flattened," he explained.

Furthermore, he uttered, its process has touched along 2.5 km, that is from Jalan Kapten Tendean, Petogoan until Kemang.

"Insya Allah, flooding could be minimized, as we have repaired the water vacuum machine," he disclosed.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye550 personNurito
  2. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye461 personDessy Suciati
  3. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye459 personBudhi Firmansyah Surapati
  4. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye455 personDessy Suciati
  5. Streetlights on Jalan Bekasi Timur and Pedati Pedestrian Bridge Back in Service

    access_time14-09-2026 remove_red_eye334 personNurito