Dredging in Krukut River will Be Complete in 2 Weeks
access_time October 01 2015 02:12 PM remove_red_eye 2546
Reported by Izzudin | Translated by Cintya Meliza
Reported by Izzudin | Translated by Cintya Meliza
Approaching rainy season, the Krukut River located at Jalan Bang Raya, Pulo Urban Village Kebayoran Baru, South Jakarta started being dredged.
The dredging will be complete in 2 weeks ahead
Head of South Jakarta Water Management Sub-Department, Dedy Budiwidodo stated, the dredging has been ongoing since 2 months ago.
"
The dredging will be complete in 2 weeks ahead ," he stated, Wednesday (9/30). Water Management Dept. Socialized Sekretaris River NormalizationHe hoped the river flow could be more maximal in future.
"There have thousands cubic of sediment dredged. The small islands are also flattened," he explained.
Furthermore, he uttered, its process has touched along 2.5 km, that is from Jalan Kapten Tendean, Petogoan until Kemang.
"Insya Allah, flooding could be minimized, as we have repaired the water vacuum machine," he disclosed.