You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Krukut Rampung Dua Pekan

Dredging in Krukut River will Be Complete in 2 Weeks

Approaching rainy season, the Krukut River located at Jalan Bang Raya, Pulo Urban Village Kebayoran Baru, South Jakarta started being dredged.

The dredging will be complete in 2 weeks ahead

Head of South Jakarta Water Management Sub-Department, Dedy Budiwidodo stated, the dredging has been ongoing since 2 months ago.

"The dredging will be complete in 2 weeks ahead," he stated, Wednesday (9/30).

Water Management Dept. Socialized Sekretaris River Normalization

He hoped the river flow could be more maximal in future.

"There have thousands cubic of sediment dredged. The small islands are also flattened," he explained.

Furthermore, he uttered, its process has touched along 2.5 km, that is from Jalan Kapten Tendean, Petogoan until Kemang.

"Insya Allah, flooding could be minimized, as we have repaired the water vacuum machine," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1973 personAldi Geri Lumban Tobing
  2. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1041 personDessy Suciati
  3. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye895 personAldi Geri Lumban Tobing
  4. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye784 personFakhrizal Fakhri
  5. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye690 personTiyo Surya Sakti