You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Krukut Rampung Dua Pekan

Dredging in Krukut River will Be Complete in 2 Weeks

Approaching rainy season, the Krukut River located at Jalan Bang Raya, Pulo Urban Village Kebayoran Baru, South Jakarta started being dredged.

The dredging will be complete in 2 weeks ahead

Head of South Jakarta Water Management Sub-Department, Dedy Budiwidodo stated, the dredging has been ongoing since 2 months ago.

"The dredging will be complete in 2 weeks ahead," he stated, Wednesday (9/30).

Water Management Dept. Socialized Sekretaris River Normalization

He hoped the river flow could be more maximal in future.

"There have thousands cubic of sediment dredged. The small islands are also flattened," he explained.

Furthermore, he uttered, its process has touched along 2.5 km, that is from Jalan Kapten Tendean, Petogoan until Kemang.

"Insya Allah, flooding could be minimized, as we have repaired the water vacuum machine," he disclosed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1692 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1116 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye807 personDessy Suciati