You don't have javascript enabled. Good luck with that.
Pencarian
Pemprov DKI Uji Coba Penataan Stasiun Pasar Senen
.
photo Rudi Hermawan - Beritajakarta.id

Trial Arrangement of Pasar Senen Railway Station Begins

The Jakarta Provincial Government together with PT MRT Jakarta, PT KAI and PT Transjakarta began to conduct another arrangement trial of stations in the capital. This time, it is executed at Pasar Senen Railway Station, Central Jakarta.

This pedestrian plaza emphasizes the safety, security and comfort of users of public transportation

Jakarta Transportation Agency Head Syafrin Liputo said there were at least seven main activities that realize integration in the arrangement of Pasar Senen Station, namely Transjakarta bus stop on the north side, drop-off passengers area for online motorcycle taxi and bajaj on the south side, pedestrian plaza for the community from train to public minivan and vice versa.

"There was previously no integration. This pedestrian plaza emphasizes the safety, security and comfort of users of public transportation," he expressed, at Pasar Senen Station, Wednesday (6/3).

Trial Arrangement of Tanah Abang Station Begins

He stated his party would crack down on motorists who were still parked carelessly, as the drop-off passengers area had been available at the location.

In the meantime, Retno (39), one of public transportation users positively welcomed the arrangement trial that is able to make it easier for people to move from the train to the bus or vice versa.

"Now it gets better, access is faster, previously I had to walk to the north exit," he admitted.

Linked News
Popular News indeks
  1. 10 Firetrucks Handle Fire in Kayu Putih

    access_time23-04-2024 remove_red_eye796 personNurito
  2. Water Channel Being Constructed on Pramuka Island

    access_time18-04-2024 remove_red_eye750 personAnita Karyati
  3. KPKP Agency Holds B2SA Goes to School to 10 Schools

    access_time24-04-2024 remove_red_eye693 personAldi Geri Lumban Tobing
  4. City - Sojitz Corporation Cooperate to Speed Up MRT 2A Phase

    access_time18-04-2024 remove_red_eye597 personFolmer
  5. Kebon Sayur Water Channel Dredged

    access_time19-04-2024 remove_red_eye482 personTP Moan Simanjuntak