You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Waduk Kamal Masih Terkendala

Kamal Reservoir Construction Still Awaits Land Acquisition

We will wait until the process is completed first. And then continued with land acquisition and compensation

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

The construction of Kamal Reservoir, Kamal Urban Village, Kalideres, West Jakarta, still hampered by land acquisition. From total of 40 hectares needed, the land that has been acquired is only 5 hectares.

Tegal Alur Urban Village Head, Ahmad Mawardi said that most of the land has not been acquired is used by local residents for fish farming, shrimp and residence. Currently, they have filed lawsuit over land ownership to the court.

"We will wait until the process is completed first. And then continued with land acquisition and compensation," he stated, Tuesday (1/26).

Head of Jakarta Water Management Dept, Teguh Hendrawan asserted his sub-dept will start the construction after the land status is clear and acquired.

"The reservoir will be used for water absorption before being flowed to the seat. If it was built, the flood in Kalideres and Cengkareng would be resolved," he finished.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1478 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1290 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1197 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1025 personFolmer
  5. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye947 personDessy Suciati