You don't have javascript enabled. Good luck with that.
Pencarian
Sterilisasi Jalur Transjakarta, 640 Personel Gabungan Akan Diturunkan
.
photo Jhon Syah Putra Kaban - Beritajakarta.id

Today, Transjakarta Lanes Guarded by 640 Personnel

640 joint personnel will be dispatched to sterilize Transjakarta bus lanes in several corridors today, Tuesday (6/17). Every day, those will be assigned to block and crack down on vehicle that grabs Transjakarta lane.

At 1 PM, they will attend in ceremony on the yard of Transjakarta office and move to points that have been chosen

Deputy Head of Jakarta Transportation Dept, Sunardi Sinaga disclosed 640 joint personnel consist of 120 personnel from Transportation Dept, 120 personnel from Satpol PP, 50 personnel from Polda Metro Jaya Traffic Directorate and 350 personnel from PT Transjakarta.

"At 1 PM, they will attend in ceremony on the yard of Transjakarta office and move to points that have been chosen," he stated, in Hi Roundabout area, Monday (6/13).

Army/Police Vehicles Prohibited Passing Transjakarta Lane

Sunardi disclosed, in the initial stage, sterilization is focused on corridor 1, 3, 4, 5 and 9. The reason is elevation of road separator is already done.

"Hence, private vehicle and public transport are prohibited to grab the lane," he expressed.

Thus far, passing ban on Transjakarta lane is pretty effective. Only a small percentage of vehicles are still forced grabbing the lanes.

"In future, we will wait them at the end of the road. If they still do the same thing, they will be ticketed. There must be awareness of the road user," he finished.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik