You don't have javascript enabled. Good luck with that.
Pencarian
Perubahan Desain Kepala MRT Tak Pengaruhi Target Operasional

Design Changes on MRT Won't Affect Operational Target

The proposed design changes on head carriage of Mass Rapid Transit (MRT), will not affect the operational targets. In the near future, a number of representatives will fly to Japan to discuss the proposal.

If there are less fit, it can be discussed. Foremost, operational targets must be on time

Jakarta Acting Governor, Sumarsono disclosed, the design changes will not the existing schedule. He assessed, the current MRT rolling stock is still under auction process.

MRT Train Head Design Needs Improvement

"If there are less fit, it can be discussed. Foremost, operational targets must be on time," he stated, at City Hall, Tuesday (1/17).

He explained there is additional cost associated with these design changes. However, the additional costs will be minimized in accordance with technical matter and consequence that have been agreed.

His party and several relevant officials are not satisfied with the designs that have been presented by PT MRT Jakarta. Finally, it was agreed to propose the design.

"More than 90 percent of them who attend in the forum have agreed the design changes plan. It is targeted it should be more aerodynamic," he finished.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1022 personFolmer
  2. Pramono Calls on Residents to Maintain Peace and Harmony During Ramadan

    access_time14-02-2026 remove_red_eye941 personFakhrizal Fakhri
  3. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye835 personNurito
  4. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye779 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye656 personAldi Geri Lumban Tobing